Maine Biofuels Plant Permitting In Process
Officials with the Castlerock Biofuels plant in Millinocket, Maine say permitting is in process and much of the engineering complete for the “biocrude” manufacturing plant that will produce 20 million gallons of institutional and commercial fuel annually. Built on the site of the former Great Northern Paper mill, the facility is projected to utilize 300,000 green tons of biomass material a year.
Castlerock Biofuels CEO John Murphy is excited that local landowners support the project and studies show feedstock availability that exceeds the plant’s needs. The $200 million plant is scheduled for commercial operation in 2027.
Latest News
2024 Logger Survey: Working Tough Ground
Loggers across the U.S. responded to Timber Harvesting’s recent 2024 Logger Survey, which showed that contractors in all parts of the country are having a tough time grappling with rising costs and dropping demand in some areas. For example, for the first time ever across 20-plus years of logger surveys, the number of loggers who rate their company’s financial health “poor” (9%) to “very poor” (21%) outnumber those who say “good” (21%) to “very good” (7%)—30% to 28% overall in favor of the negatives.
WANT MORE CONTENT?
Spanning seven decades since its inception in 1952, Timber Harvesting highlights innovative and successful logging operations across the U.S. and around the world. Timber Harvesting also emphasizes new technology and provides the best marketing vehicle for the industry’s suppliers to reach the largest number of loggers in North America and beyond.
Call Us: 800.669.5613