Maine Biofuels Plant Permitting In Process
Officials with the Castlerock Biofuels plant in Millinocket, Maine say permitting is in process and much of the engineering complete for the “biocrude” manufacturing plant that will produce 20 million gallons of institutional and commercial fuel annually. Built on the site of the former Great Northern Paper mill, the facility is projected to utilize 300,000 green tons of biomass material a year.
Castlerock Biofuels CEO John Murphy is excited that local landowners support the project and studies show feedstock availability that exceeds the plant’s needs. The $200 million plant is scheduled for commercial operation in 2027.
Latest News
New From Tigercat: Triangulated Harvesting Head
In late September 2023, visitors to the Pacific Logging Congress, a live demo event held in Washington state, got a sneak peak of the new Tigercat 573 harvesting head processing logs on the end of a Tigercat 875E logger. Since then, multiple units have been testing in far flung regions from Alberta to Australia and the results are in. The 573 is shaping up to be a high performing, reliable head for roadside processing and harvesting.
WANT MORE CONTENT?
Spanning seven decades since its inception in 1952, Timber Harvesting highlights innovative and successful logging operations across the U.S. and around the world. Timber Harvesting also emphasizes new technology and provides the best marketing vehicle for the industry’s suppliers to reach the largest number of loggers in North America and beyond.
Call Us: 800.669.5613